Ashcombe School was in desperate need of a washroom refurbishment as it was falling into disrepair and was fuelling student behaviour issues. They also required more cubicles, and there was often an unbalanced demand between the boys and the girls.
Our Solution
Firstly, Brookhouse needed to understand Ashcombe's pains and create a design to eliminate these as best as possible. It quickly became apparent that they needed a unisex school washroom open to the corridor to create extra space and to mitigate behaviour issues. Many existing toilets were not working, so they needed this completed as soon as possible. The half-term break was identified as a week to carry out the demolition works.
The location of the school washroom refurbishment was on the primary school corridor. With the project being carried out during term time, it was essential to ensure this was carefully managed to ensure safeguarding and to cause as little disturbance as possible.
We created a design concept with full height cubicles to reduce the issues they were having and specified a trough and automatic infrared taps and soap dispensers to stop the students from filling up the basins and making them overflow.
The solid grade laminate school washroom system has a floor & ceiling track to achieve privacy and create an extremely robust washroom that will last for years to come. All fittings are also bolted through to ensure no damage to the laminate.
We Provided
Artemis+ - Standard Height Cubicle - Panel Cubicle
Artemis - Standard Height Cubicle - Panel Cubicle
Parmiter's School | Washroom Refurbishment
Simon Balle School | Washroom Refurbishment
Tower Supplies Office Refurbishment
Interconnector Office Refurbishment
Concierge Camping
Honiton Swimming Pool
Ysgol Y Bynea
Ysgol Saron