OVERVIEW
REQUIREMENT: The planned site improvements included relocating the loading bay and installing compliant access steps to the post room.
ADDITIONAL INFORMATION: CAD and technical drawings were designed in-house and based on site measurements taken.
END RESULT:
We installed the modular access steps within a few hours. Once the installation was complete, the system was instantly usable. This allowed the post room to open within a quick turnaround time.
The access steps are fully compliant with documents M & K of the building regulations.