OVERVIEW
Firstly, BrookhouseUK needed to understand Ashcombes pains and create a design to eliminate these as best as possible. It quickly became apparent that they needed a unisex school washroom open to the corridor. Many existing toilets were not working, so they needed this completed as soon as possible. The half-term break was identified as a week to carry out the demolition works. A critical path was created with the initial demolition works during the half-term break. The location of the school washroom refurbishment was on the primary school corridor. With the project being carried out during term time, it was essential to ensure this was carefully managed. BrookhouseUK worked through our term-time methodology with Ashcombe school to ensure safeguarding issues were covered and the project was as little disturbance as possible.
Working during the term-time is what BrookhouseUK specializes in. We can be successful at this because of our understanding and experience of how schools operate and the discipline of our workforce, which is enhanced DBS certified. We created a design concept with full height cubicles to reduce the issues they were having and specified a trough and automatic infrared taps and soap dispensers to stop the students from filling up the basins and making them overflow. The solid grade laminate school washroom system has a floor & ceiling track to achieve privacy and create an extremely robust washroom that will last for years to come. All fittings are also bolted through to ensure no damage to the laminate.
Apollo - Full Height Cubicle - Panel Cubicle
Parmiter's School | Washroom Refurbishment
Simon Balle School | Washroom Refurbishment
Ashcombe School | Washroom Refurbishment
Tower Supplies Office Refurbishment
Concierge Camping
Honiton Swimming Pool
Ysgol Y Bynea
Ysgol Saron