OVERVIEW
Fulham Gasworks Phase 2:
System: TerraSmart Vitrified Composite
Finish: Vitrified Composite Sunbleached Oak
Worked with: Subcontractors? Installers?: AYM Services Ltd
Main contractors: Berkeley
The Challenge: Overcoming Wind Uplift Issues in High-End Residential Spaces
Fulham Gasworks Phase 2, part of the prestigious King’s Road Park development in London, is a continuation of Berkeley Group’s vision to transform a former gasworks into a sustainable urban quarter. This high-profile project features over 1,800 homes, commercial spaces, and landscaped areas, all designed to epitomize luxury and modern living.
For Phase 2, the project faced a significant challenge: wind uplift risks that could compromise the stability of proposed terrace and balcony finishes. The original specification of aluminium decking proved unsuitable due to its lightweight nature, which heightened the wind uplift risk.
The development needed an alternative system that met strict building regulations, mitigated wind uplift, and maintained the desired aesthetic for this premium location—all without penetrating the waterproofing and insulation.
The Solution: TerraSmart® Vitrified Composite System
RYNO stepped in with the perfect solution: the TerraSmart® Vitrified Composite System in a stunning Sunbleached Oak finish. This innovative system was chosen for its ability to meet both functional and aesthetic requirements:
Collaborative Success: Working with AYM Services Ltd and Berkeley Group
RYNO collaborated closely with AYM Services Ltd, the installation partner, and the main contractor, Berkeley Group, to ensure the successful delivery of the system.
Although RYNO didn’t work directly with the architects on Phase 2, the partnership with Berkeley and AYM allowed for smooth communication and efficient problem-solving throughout the process.
Building on Fulham Gasworks Phase 1
Phase 2 builds on the success of Phase 1, where RYNO played a pivotal role in transforming balcony and terrace designs to align with current building regulations. Phase 1 showcased RYNO’s expertise in replacing combustible materials with high-quality, non-combustible porcelain finishes.
Real Results: A Stunning and Functional Outdoor Space
The final result speaks volumes. Fulham Gasworks Phase 2 terraces now feature a secure, regulation-compliant, and visually striking decking solution that enhances the living experience for residents. By mitigating wind uplift and preserving waterproofing, RYNO’s TerraSmart® Vitrified Composite System has proven itself as a top-tier choice for premium developments.
Looking Ahead
The success of Fulham Gasworks Phase 2 reaffirms RYNO’s commitment to delivering innovative, high-performance solutions for luxury residential developments. As King’s Road Park continues to evolve, RYNO is excited for the next phase.
Contact RYNO by clicking the button below to find out which products were used in this case study.
Island Point Apartments, London
Case Study: M7 Roof Terrace
Wood Wharf A2/A3 Roof Terraces, Canary Wharf
Caledonian Road Apartments, London