OVERVIEW
Project Description
The capital of Austria, Vienna, is home to one of the country's most powerful structures: The parliament building from the 19th century comprises the seat of the two chambers of parliament, the National Council as well as the Federal Council of the Republic of Austria.
As part of the general renovation of the historic building complex on Vienna's Ringstrasse, Lindner GmbH was involved in the construction project with numerous products and services. In addition to the repair of
damage to the building fabric, the main objective was the general modernization of the property within the framework of the preservation of historical monuments. The combination of Lindner's modern hollow floor
system FLOOR and more® and the historic overlay therefore met all the requirements. In order to continue to preserve the classic look of the wall and ceiling surfaces, the entire building services were installed in the access floor - completely in line with the maxim of sustainability.
Completed Works:
Floors:
- FLOOR and more® comfort
- FLOOR and more®
- HYDRO comfort
Ceilings:
-Plafotherm® GK HEKDA®
Insulation Engineering
HYDRO - Dry hollow floor for humid areas
Hollow Floor System with Integrated Heating - FLOOR and more® comfort
Lindner Hollow Floor Pedestals Type L
Lindner FLOOR and more® G 40 x L/D
Projektreport Allerhuset Denmark
Maxwell Centre, University of Cambridge
John Lewis Oxford Street
Wembley Stadium
The Cube
Birmingham Library
The Shard
HAUSER CB - Metal Ceilings, LIGNA and NORTEC raised floors
Nova N2 Development - London - Modular Washrooms
MOL campus - Floor and more G40 and NORTEC
INTERNATIONAL RUGBY EXPERIENCE -> FLOOR and more®
GBC 5 - VENTEC - NORTEC- FLOOR and more