OVERVIEW
The new building and the renovation project impress with generous outdoor spaces and appealing architecture. The Lindner Group played a major role in the interior fit-out.
For a modern look, a combination of glass and wood was chosen – the Lindner Life Stereo 125 Glass Partition
therefore meets wooden doors and wooden partitions.
These were complemented by wall claddings and partitions made of metal: Thanks to their magnetic properties, these can be easily used to organise documents and design elements, what makes them highly functional.
Furthermore, Lindner installed a custom-made counter cladding as a special solution for the sliding window as well as a raised floor for the technical rooms in the basement.
Completed Works
Lindner Raised Floor Pedestals Type M
Wall Cladding
Lindner Raised Floor Pedestals Type S
Double Glazed - No Fire Rating - Double glazed modular partition
Solid Double - No Fire Rating - Solid partition
Lindner Raised Floor Pedestals Type SWH120
Lindner Raised Floor Pedestals Type H
Projektreport Allerhuset Denmark
Maxwell Centre, University of Cambridge
John Lewis Oxford Street
Wembley Stadium
cGMP Advanced Manufacturing Area for Orthoplastics
Compound Semiconductor Innovation Centre for CSA Catapult
The Compound Semiconductor Facility for IQE
cGMP Global Packing Centre for AstraZeneca
The Cube
Birmingham Library
The Shard
HAUSER CB - Metal Ceilings, LIGNA and NORTEC raised floors
London School of Economics - Saw Swee Hock Student Centre (SAW)
Clapham Junction
Harrods Fashion Lab
Royal West Academy