OVERVIEW
REQUIREMENT:
Following the identification of reinforced autoclaved aerated concrete (RAAC) issues in the school's Red Block, temporary modular classrooms were installed to maintain uninterrupted in-person learning during repair works.
To support this setup, our modular steps were installed, providing safe and reliable temporary access to the classrooms.
Just like the modular buildings, our solutions are fully reusable and easy to dismantle, making them ideal for future relocations.
This flexibility sets them apart from traditional concrete or timber steps, which are typically single-use and lack the adaptability needed for evolving site requirements.
DESIGN PHASE:
During the site survey, a RapidScanner was used to digitally capture a comprehensive 3D map of the area, including all visible features such as buildings, changes in floor levels, and any obstacles.
This advanced technology enables us to carry out surveys swiftly and accurately, even when working to tight deadlines.
Once the data had been gathered, our in-house design team created a precise 3D model of the proposed systems, overlaid onto an accurate representation of the actual site.
INSTALLATION:
Once the modular buildings were positioned in the school’s front yard, we installed compliant modular step units along with a connecting walkway platform to ensure smooth and safe access between the two classroom blocks.
The hire period for the units matched the lease duration of the buildings. At the end of the term, the units were dismantled and prepared for reuse in other rental projects.
FEATURES INCLUDED:
Contact Rapid Ramp Limited by clicking the button below to find out which products were used in this case study.
Conquest Hospital, St Leonards-on-Sea
Weigh Cabin Platform & Steps, Birmingham
Bognor Regis, West Sussex
Coca-Cola Enterprises, Wakefield