NBS Source
I'm a manufacturer
Total Vibration Solutions Limited t/a TVS Group

Total Vibration Solutions Limited t/a TVS Group

SPORT, FITNESS, PLAY, ACOUSTICS

+44 (0)1706 260 220 Website

Sort by:

Showing 1-14 of 14

Sponsored
Anytime Fitness, Sheffield

Anytime Fitness, Sheffield

Total Vibration Solutions Limited t/a TVS Group

Project/ObjectiveProtection of offices from noise and vibration due to dropping freeweights.
Sponsored
Blaze Studio Birmingham - RESi Dry Floating Floor

Blaze Studio Birmingham - RESi Dry Floating Floor

Total Vibration Solutions Limited t/a TVS Group

Set in the centre of Birmingham, BLAZE Studio marked a significant first for David Lloyd Clubs. It was first stand-alone HIIT (High Intensity Interval Training) Centre to be created outside its 64-strong network of Clubs. But its creation in the heart of the city’s business district, and its planned dynamic and fast-paced HIIT sessions involving Cardio, Strength and Combat sessions synced to high energy music, presented potential acoustic issues. TVS installed its well-proven RESI Dry Floating Floor System throughout the project area and even isolated individual boxing bags using specially designed isolation pads.
Sponsored
Building Isolation - Bridgewater Hall Concert Hall

Building Isolation - Bridgewater Hall Concert Hall

Total Vibration Solutions Limited t/a TVS Group

The Bridgewater Hall in Manchester is a 2400 seat concert hall constructed in close proximity to the cities Metrolink tramway. Ground-borne vibration caused by passing trams was highlighted by Arup as going to cause unwanted structural noise within the performance space. To avoid this the building was constructed off 280 number GERB pre-stressable coil spring bearing assemblies positioned on the concrete column heads and tuned with a vertical natural frequency of 3.5Hz.
Sponsored
easyGym Oxford Street

easyGym Oxford Street

Total Vibration Solutions Limited t/a TVS Group

Because of its position on the upper level of a busy shopping plaza in the heart of London, this gym required a robust flooring solution for the weightlifting area.The selected solution needed to help the gym co‐exist comfortably within the surrounding retail environment.To fulfil this requirement, TVSsupplied SPORTEC Style impact attenuating rubber floor tiles, made from a mixture of black recycled rubber bound together using a polyurethane resin with a coloured EPDM granule added to the wear layer.This product was chosen because the highly resilient material offers substantial protection to the substrate and is particularly effective in busy weight training areas where dumbbells are dropped frequently.The interlocking tiles are simple to install and require little tono maintenance.The resulting floor covering offers good grip underfoot and the bright orange fleck also complements the company’s striking corporate colour scheme.This area of the gym is used for activities such as deadlifting, squatting and bench work using dumbbells.
Sponsored
Hallé Orchestra, St Peter’s Manchester - Acoustic Floating Floors

Hallé Orchestra, St Peter’s Manchester - Acoustic Floating Floors

Total Vibration Solutions Limited t/a TVS Group

The award-winning Halle Orchestra has a new home in the city after the completion of a £6.6 million three-storey extension to a former church dating back to 1859. To ensure that the resulting extension would meet the orchestra’s exacting acoustic requirements, Architects Stephenson Studio called in TVS Group. TVS was tasked with designing and installing specialist acoustic flooring together with steelwork isolation pads which sit within the floors to take various column loads. The specialist TVS RESi Concrete Metal Floating Floor was installed over three different rehearsal areas.
Sponsored
Newcastle Academy polyurethane sports hall refurbishment

Newcastle Academy polyurethane sports hall refurbishment

Total Vibration Solutions Limited t/a TVS Group

 Scope of Works After more than a dozen years of intensive use, the flooring of Newcastle Academy’s sports hall was showing its age. TVS addressed areas of localised damage and sanded the floor to create a better surface for bonding – all in preparation for a rapid flooring makeover. Next TVS installed a new, self-levelling and seamless polyurethane performance wear layer. It was finished with a new sports grade polyurethane topcoat in RAL 7000 ‘Squirrel Grey’ designed to give the sports hall a more updated look. Then, following discussions with the Academy, priority sports were identified and a customised line marking plan agreed for the compact sports hall. Finally, brand new, extra wide cover details were supplied and installed to ensure protection at all points of entry. The total installation took just 5 days and delivered an instant transformation. For those looking to update, replace or refurbish sports facilities after a decade or more of use, this project underlines the distinct advantages of selecting TVS polyurethane sports flooring, namely: • No necessity to fully remove the existing sports flooring, saving time and expense • No need to re-screed the subfloor or install new shock-absorbing layers Providing existing surfaces still perform to required standards, TVS can rejuvenate surfaces with a new hard-wearing polyurethane layer that transforms its appearance and provides significant time and cost savings. "This is our first time working with the team at TVS Group and its safe to say it certainly won’t be the last! From start to finish we have nothing but praise for the great level of communication, professional advice and guidance we received from the onset of this project. What we found to be particularly helpful was the number of questions and communications that took place to ensure we had the right installation for the Academy, that the specification met with Sport England criteria and, as importantly, that our students and community groups would have an exemplary sports facility available to them. Pre contract health and safety information was provided timely and without issue. The installation team worked fantastically and from a contract management perspective were excellent to work with. Post installation we were provided with the O&M manual. The installation itself is fabulous and our students and staff are amazed at the transformation of the sports facility in just a small number of days. We look forward to many years use of our fantastic new facility!" Vickie Keeling, Trust Director 
Sponsored
Owen Street, Manchester - RESi Dry Floating Floor

Owen Street, Manchester - RESi Dry Floating Floor

Total Vibration Solutions Limited t/a TVS Group

Owen Street development is one of the city’s most high profile residential-led developments. But how would the planned integration of health and fitness facilities within the complex impact on the tranquillity of residents? TVS was approached by Fisher Acoustics to recommend a specialist acoustic floor build-up that would meet stringent acoustic criteria to protect residents and leisure users from any unwanted transmitted noise. The approved solution from TVS included installation of a specialist TVS RESi Dry Floating Floor System across the two floors incorporating the High Intensity Interval Training facilities and Yoga studios.
Sponsored
Primal Gym, Leeds

Primal Gym, Leeds

Total Vibration Solutions Limited t/a TVS Group

Project/ObjectiveProtection of apartments and adjacent businesses from noise and vibration due to dropping freeweights.
Sponsored
Rochdale Riverside Cinema - Acoustic Floating Floors

Rochdale Riverside Cinema - Acoustic Floating Floors

Total Vibration Solutions Limited t/a TVS Group

As part of the Rochdale Riverside new development, the TVS Group was approached to assist in the construction of a new 6-screen Reel Cinema to ensure that Reel’s acoustic requirements for the space were met, as well as ensuring that adjacent businesses would not be adversely affected.
Sponsored
Third Space Islington Gym

Third Space Islington Gym

Total Vibration Solutions Limited t/a TVS Group

Third Space has opened its sixth and most luxurious health club in London with spacious training areas, state-of-the-art facilities, tranquil yoga studio, 20m adult pool, cycle amphitheatre and special facilities for youngsters.Free Weights AreaTVS Group’s heavy-duty, interlocking SPORTEC® Style Tiles, custom-produced black and grey-flecked finish perfectly completemented the gym’s colour scheme. Installing a layer of SPORTEC® Team Cup-X flooring beneath the tiles provided extra protection for the concrete subfloor and will further reduce noise and vibrations, while TVS proprietary rubber ramped edges created a neat transition with adjacent gym areas.Stetching AreaTo offer comfort and durability for the club’s large stretching area, TVS Group installed its SPORTEC® MotionFlex product, a fine-grained polyurethane puzzle-mat. It is ideal for fitness applications involving floor-based movements and wellness activities. The interconnecting tiles are simple to install and neatly shaped to suit most flooring schemes while their elegant dark grey colour set the calming mood for this part of the gym.Athletics-Based Track AreaTVS Sports Carpet was selected for the track as it offers excellent grip underfoot, especially relevant for speed, agility and quickness drills. The durability of the surface also allows athletes to push or drag a sled, helping to further develop their muscular strength and endurance. The track was supplied in a cool, oceanic navy blue and white colour scheme.Main Gym AreaThe expected high usage of the main gym area meant the flooring had to be sufficiently resilient. To achieve this and to ensure a perfectly level flooring finish across the gym, TVS Group first laid a dense rubber shock pad over the concrete substrate. It was overlaid with a covering from the highly wear resistant SPORTEC® Purcolor range. A light grey finish was chosen to reflect the sophisticated look and feel of the club.The StudioIn the studio, where high intensity training will take place, TVS Group opted for a highly elastic shock-absorbing underlay overlaid with a wear-resistant performance layer called SPORTEC® Color. The combination will protect the concrete substrate below while offering a comfortable and safe surface above for those involved in a diverse range of training activities.Other Fitness AreasIn other areas of the gym TVS Group supplied and installed a variety of high performing acoustic underlays, helping reduce noise and vibrations caused by treadmill running and other high impact activities in the studios.
Sponsored
TVS ABSorb Baffles - 3 Hardman Street Manchester

TVS ABSorb Baffles - 3 Hardman Street Manchester

Total Vibration Solutions Limited t/a TVS Group

TVS Group were approached to reduce noise levels in certain areas of the new offices created for Protector Insurance. Working with the client and contractor, TVS proposed and supplied 125 no. TVS ABSorb Baffles wrapped in striking lobster-coloured Camira Lucia fabric. The client is delighted with the level of noise reduction achieved and the way the baffles integrate with the existing office colour scheme.
Sponsored
Vibration Isolation of Property near Railway Line

Vibration Isolation of Property near Railway Line

Total Vibration Solutions Limited t/a TVS Group

TVS was Group was tasked with the isolation of a new luxury residential property in Mayfair from ground-borne noise and vibration from the nearby Jubilee line. A target re-radiated noise criterion of 30dB LAmax,(slow) within the lower ground floor (the worst affected area) meant that a fully floated raft foundation was required with a target natural frequency of 10Hz.A combination of Sylodyn products in 50mm thickness across the base of the raft, and Sylomer materials in 37.5mm thickness up the basement walls, provided this high-performance solution, whilst bespoke treatments around service penetrations and at connections to adjacent buildings ensured that this was not compromised throughout the rest of the construction.Close work with the design team throughout the planning and specification process provided a solution that integrated seamlessly with the structure and waterproofing detail, whilst detailed layout plans, on-site training and supervision resulted in an easily installed system.
Sponsored
Vibration Isolation of Residential Building over Tube Lines

Vibration Isolation of Residential Building over Tube Lines

Total Vibration Solutions Limited t/a TVS Group

TVS Group was tasked with the isolation of a residential property in St. John’s Wood as part of a redevelopment and basement extension. With the property in close proximity to the Jubilee line and the Metropolitan line passing only 5m away from the new basement extension, radiated noise and vibration was a serious concern for the client.An isolation layer utilising varying stiffnesses of Sylomer materials spanned the underside of the basement slab, continued up between the contiguous piled wall and the lining wall, and then across the top of the capping beam and to the side of the ground floor slab.Close work with the design team throughout the planning and specification process, provided a solution that integrated seamlessly with the structure and waterproofing detail.
Sponsored
Xercise4Less Gym

Xercise4Less Gym

Total Vibration Solutions Limited t/a TVS Group

TVS was tasked with designing a versatile and multi-functional training area to be rolled out across various newXercise4Less sites.The brief was to include an area for sledge work along with floor demarcations for various activities such as walking lunges, sprinting and battle rope exercises.To fulfil this requirement, TVS first created layout plans to fit the space prior to agreeing the final design with the client. Once the design was signed off, TVS set about ordering materials to complete each of the projects. With the subfloor levelled to within an acceptable tolerance, a hard‐wearingmulti‐sports surface TVS Sports Carpet (Green) was bonded to the substrate to create a central lane for pushing and pulling a sledge.Meanwhile, SPORTEC Color‐0 a black recycled rubber floor covering was installed around the outside of this area.To create a 2‐lane running track with 1m markings, white lines were then applied to the black rubber utilising a 2‐part PU paint.The perimeter edge detail was finished with a black uPVC trim, providing a safe and neat transition between the adjacent floor finishes.The workout area is used effectively for training small groups of people as well as one‐to‐one personal training sessions across multiple sites.

Showing 1-14 of 14